How Long Does a Home Renovation Usually Take?

How Long Does a Home Renovation Usually Take?

There’s a misconception that renovating a home is often a nightmarish undertaking with uncontrollably high costs and deadlines. While regrettable, it makes sense. People tend to remember and repeat horror stories over and over again, and like all tall tales, some of these have more than a hint of reality to them. A schedule for a home renovation project must take into account a plethora of aspects, and unforeseen problems frequently arise that affect the ultimate move-in date. There are several factors that determine whether a project remains on track. That’s what we want to discuss today.

What Elements Affect a Whole Home Renovation Project’s Schedule?

The majority of respectable contractors, including us, make every effort to complete jobs on time, but occasionally unanticipated events can cause delays.

The weather 

Dry, cool springtime weather is ideal for construction. Starting construction early in the spring enables the foundation, frame, and exterior of the home to be completed before the summer heat.  Severe temperature variations affect the drying time of paint, and excessive precipitation can create muck that ruins flooring and foundations and stops the framing from being installed.  The weather will have less of an impact on scheduling once the foundation has cured and the majority of the work has been transferred indoors. It is important to keep in mind that building during the winter typically costs less and permits are granted more quickly due to lower demand.

Unexpected Problems with the Current Organization 

Sometimes, when the demolition process starts, problems emerge that are unavoidable, and resolving them could cause your remodeling schedule to slip. The most frequent ones are a fractured foundation, low-quality workmanship, plumbing problems, mold and water damage, which, although never pleasant, are not always causes for concern. 

Changes in Design

In the course of a complete home renovation, most competent builders can accommodate fair and modest design adjustments. But, if they are significant and call for additional resources, labor, or a whole redesign, this might seriously blow the budget and postpone construction.

Whole Home Remodeling Timelines

The length of time needed for a home’s renovation depends on the size of the property and the project’s complexity. Smaller houses typically require seven to ten months for renovations, from the time of discovery to the conclusion of building. If everything goes as planned, larger entire house remodels can be completed in nine to fifteen months.

The remodel timetable might consists of the following five steps: 

  • Discovery
  • First consultation
  • Design & proposal
  • Pre-construction
  • Construction

Discover the right company

During this stage you’ll have to interview builders, designers, and contractors, and decide which business is best for your home renovation. This will help you determine cost and design possibilities. This can take one to three months, depending on the amount of interviews. Homeowners are encouraged to speak with multiple firms so they can be exposed to a variety of concepts. It is crucial for homeowners to ascertain whether the designers and remodelling vision of the organization align with their own.

First consultation

Construction companies want to provide their clients with the knowledge they need to confidently go forward with their design concept at the first consultation phase of a total home renovation. During this stage, companies often present estimates of possible expenses and hold talks on the ideal project scope and refurbishment ideas. We advise doing the following to get the most out of this consultation:

1. To demonstrate your tastes, bring along motivational photos from websites like Houzz, Pinterest, or publications.

2. Be ready to ask questions; this can help you find design possibilities you may not have thought of before.

3. Make an approximate estimate of your spending plan. When renovating a home, it’s critical to be aware of your budgetary limitations. 

Creating a design plan is the next step after answering preliminary questions. It’s critical that clients voice any doubts or disapprovals with recommendations or design choices.  Facilitating a well-thought-out makeover that is in line with the client’s expectations and vision is the ultimate objective here.

Design & proposal

The duration of the design phase is around five to six weeks, contingent upon your level of involvement. You will collaborate closely with a designer during this phase to decide on the overall style and aesthetic of your new area, including the inside walls, structure, and minor details. 

Pre-construction

A project manager takes charge at this point. You should anticipate that he will:

  • Together with your designer, complete the plans.
  • Purchase the supplies you will need for the job.
  • Set up a time for a team of specialists to work on your house.
  • Tell you when work is anticipated to begin. 
  • Meet with you prior to the commencement of construction to make sure that everyone is in agreement.

Depending on the time required to find the materials, this stage of the home renovation process may take eight to ten weeks.

Construction

The goal is to make sure that every customer has the most fun and stress-free day possible. Once work commences, the construction teams aim to work as efficiently as possible to minimize disturbances to your living area.  The amount of time needed to complete various home improvement projects varies. Below is a rough estimate of how long basic projects will take:

  • Six weeks for finishing a basement
  • Eight weeks for a kitchen remodel
  • Eight weeks for a complete home renovation
  • Six weeks for constructing a backyard getaway 
  • Four weeks for exterior home renovation

How to Shorten the Timetable for Your Home Renovation

Although it is quite common for a complete home renovation to take one or two weeks longer than expected, homeowners can take a few steps to make the process go more smoothly and shorten the remodeling time frame.

Recognize the Lead Time

It is recommended that clients set aside time during the planning stage to choose their materials and complete their designs prior to the start of the pre-construction phase. This method makes it possible to order materials without reluctance. The remodeling schedule may be delayed if supplies are not chosen in a timely manner because different materials may require different amounts of time for sourcing and shipment.

Keep to the Initial Plan

Although there is a chance for some midway adjustments, the remodeling project timeframe will be impacted. Including your builder in the design process or delaying signing off until you are completely satisfied with the finished layout are two ways to avoid this.  It is preferable to take your time and consider all the options if you are confused about anything than to decide quickly and then regret it midway through the development.

Adopt a Conservative Budget

It is wise to dedicate an extra 5%–10% of your overall budget for home renovations. This way, if something does go wrong, contractors have some leeway to change the scope without having to re-budget the entire project, which would just cause delays. If you have to make changes or cancellations to stay inside your budget, re-budgeting can also become out of control.

Pick a Suitable Contractor 

Given the high cost of renovating, it makes sense that homeowners might occasionally choose less priced contractors. But if your builder is not involved in every facet of your home renovation, you might have poor work that ends up costing more in the long run, turning your ideal project into a nightmare. Always look for a business with a solid track record and transparency.

Conclusion

In conclusion, a home renovation project’s duration is affected by a number of factors, and although unanticipated delays occasionally happen, there are ways to quicken the process. Homeowners may anticipate probable difficulties and prepare appropriately by taking into account factors such as weather conditions, unforeseen complications during demolition, design revisions, and the total project timetable. Through adherence to a systematic schedule that includes phases like design, construction, pre-construction, and discovery, customers may more efficiently traverse the remodeling process. A smoother and more effective renovation process may also be achieved by taking preventative actions like choosing materials ahead of time, sticking to the original design, setting aside a modest budget, and hiring a reliable contractor. 

Ultimately, homeowners may more easily and satisfactorily accomplish their intended renovation outcomes by comprehending the factors that impact project deadlines and putting procedures into place to prevent delays.