How Long Does a Bathroom Remodel Take?

how long does a bathroom remodel take

Remodeling a bathroom can be a hassle and usually takes a few days to a month or even longer, depending on your specific plans and the project’s scope. Opting for a do-it-yourself approach may speed up minor changes like fixture updates or repainting, typically taking a few days to a week. 

However, involving professionals such as a general contractor is advisable for more extensive renovations, with the timeline generally falling between two to three weeks. Factors like permitting, unforeseen issues, and the sequential nature of specific tasks can contribute to the overall duration. Engaging professionals ensures a smoother process and helps navigate potential challenges, making it a practical choice for a more efficient and well-executed bathroom remodel.

Factors Influencing Bathroom Remodel Duration

Let’s face it—bathroom makeovers rarely go exactly as planned. Different things can mess up the schedule:

  1. Type of Remodel: Is it just a surface-level upgrade or a total rebuild? The time it takes can range from a few days to many months.
  1. DIY or Contractor: If you do it yourself, it might drag on for months. Hiring a contractor can speed things up, but it depends on whether they do all the work or bring in specialists.
  1. Contractor Setup: Is your contractor doing everything alone or hiring others? One-person teams might be cheaper but could take longer if they juggle multiple projects.
  1. Material Availability: If you need special-order stuff, like imported tiles, waiting for them can add weeks to your project.

Despite all these variables, the right contractor can give you a rough idea of how long it’ll take to redo a small bathroom completely.

Remodeling a Bathroom – Timeline & Approaches

Before construction begins, homeowners typically meet with their interior designers to discuss the project timeline. Surprisingly, a regular bathroom renovation usually takes about three to eight weeks. This includes removing old bathroom features like showers, lights, and baths.

The duration can vary based on the type of builders you hire. Some builders focus on completing one project at a time before moving to the next. This usually leads to a quicker completion since all attention is on your bathroom. They could do a straightforward swap of pieces.

Remodeling a Bathroom

On the other hand, more common nowadays are builders who handle multiple projects simultaneously. They schedule different builders across various projects throughout the week. You might notice a day or two without anyone working on your site. These builders often come in small teams, so expect different faces at your house during the week.

Regardless of the builder type, ensure you get quality work and a new bathroom suite that meets the correct standards. Prices can vary based on the extent of the work needed.

The Phases of Bathroom Remodeling

PhaseWhat HappensKey ActivitiesWhen It Ends
Pre-constructionPlanning phase where organization, material gathering, and contractor hiring occur.Securing permits and finalizing plans.When all permits are secured, building work can start.
ConstructionThe actual building and renovation phase. It involves eliminating old elements, constructing the new space, inspections, and finishing touches.Removing old items and building the new space, inspections, and adding finishing touches.When construction is complete.
Post-constructionChecking and reviewing the completed project. Involves walkthroughs, contractor feedback, finalizing payments, and officially concluding the project.Reviewing changes, receiving feedback from contractors, and settling final payments.When the project is formally completed.

Phase 1: Pre-Construction – Three Weeks

If you are thinking about remodeling your bathroom, the first step is the pre-construction phase, which takes about three to four weeks, assuming you already own the property. If not, add the time it takes to buy a house, typically around a month.

During this phase, your job is to dream up your ideal bathroom and hire the right people to make it happen. Look for bathroom remodelers with the proper licenses and expertise in working with tile, plumbing, and electricity. A skilled professional can ensure a smooth process and help you avoid any issues.

You can save money by keeping the same water supply and drainage layout, as moving these lines can be expensive. Once you have found potential contractors, invite them to visit your current bathroom, share measurements and material preferences, and show them any design ideas you like.

Contractors will then provide written bids within a week. Take some time to review these bids, choose your favorite contractor, sign the contract, make the initial payment, and set a construction schedule.

Do not forget to get any necessary permits from your city and state, which may take a week or two. Most contractors are familiar with the process and can guide you through it.

Phase 2: Construction Time – One Week

The construction phase varies for everyone, depending on how extensive your renovation is. Give yourself about a week to break down the old bathroom before installing new flooring, tiles, faucets, and light fixtures.

If your project needs city permits, schedule a week for an inspector to check electrical rewiring and new plumbing. Be ready for possible waiting lists. You can not move forward until a master plumber, electrician, or inspector approves pipes, water lines, gas lines, and wires.

This is a crucial time for you to be involved. Contractors may miss problems, so stay engaged and communicate.

Once the “bones” behind the walls are done, like plumbing and wiring, you can install the tub, vanity, sink, and toilet. Tiling, shelving, and hardware usually come last.

Do not forget to clean up! Even with precautions, there might be dust and debris from drilling and other work. Be prepared to tidy up as you go.

Phase 3: Post-Construction – One Week

Before celebrating, do a final walkthrough with your contractor. 

Check every detail, like drawers and doorknobs. If you find any issues, let your contractor know so they can fix them. Also, ask about their policy if you notice problems a few weeks later.

Once you are happy with the work, make the final payment to your contractor and leave them a good review. That way, your friends and neighbors can benefit from their expertise, too.

The Step By Step Process 

StepTask Description
1Planning It All OutPlan your bathroom remodel by researching material prices and getting quotes from contractors. Consider color schemes and create a new floor plan to change the layout.
2Demolishing Your Old BathroomDisconnect electricity and water supply, carefully remove fixtures, and check for damages. Take down wall tiles without harming underlying piping or wiring.
3Make Plumbing AdjustmentsPlumbing for new fixtures, replace the toilet flange, install a new bathtub or shower, and make any necessary adjustments for additional sinks or changes to vanities.
4Attend to the Electrical WorkRework the bathroom’s electrical wiring, replace wiring if needed, install or relocate outlets and light switches, and consider adding GFCI receptacles for safety near water sources.
5Install Blocking for Grab BarsAdd blocking between wall studs to provide support for future grab bars. Alternatively, secure solid material in areas where grab bars might be needed for safety.
6Close the WallsPut up a vapor barrier and cement board in moist areas, providing resistance to moisture and supporting wall tile. Use drywall for other walls.
7Begin PaintingChoose interior paint with a semi-gloss or satin finish, resistant to bathroom moisture. Complete the paint job before installing flooring and fixtures to prevent splattering.
8Put Up the TilesStart with the bathtub enclosure or shower walls, then move on to other areas. Use grout for tiles and caulk for corners, enhancing the bathroom’s aesthetics.
9Put Up the Shower DoorInstall the track, shower curtain rod, or door for your shower enclosure, choosing a design that complements your bathroom remodel.
10Install the Exhaust Fan and LightsHook up and install wall and ceiling lights, and connect the exhaust fan correctly for ventilation.
11Install the Sink and Other FixturesMove the sink and vanity into place, hook up plumbing for new fixtures, and complete the bathroom remodeling process by installing the toilet, light switch plates, shelving, and other items.

DIY or Hire Professionals?

Deciding whether to tackle a bathroom remodel on your own or hire a professional is not just a simple “yes” or “no” question. 

1. Do it yourself:

Pros: Can save money.

Cons: It takes longer, especially if you have a busy schedule with work and family commitments.

2. Hire a professional dedicated to your project:

Pros: Faster completion since your bathroom is their sole focus.

Cons: It may cost more than a DIY approach.

3. Hire a professional working on multiple projects:

Pros: Can be cost-effective.

Cons: Might experience delays as workers juggle multiple jobs.

Some bathroom projects are excellent for a DIY adventure, like changing the faucet or giving the vanity a fresh coat of paint. But if you are considering moving the shower, rewiring for new lights, or doing fancy tile work, it is probably better to call in a pro. These jobs need some severe know-how to ensure everything is safe, done right, and on time.

Successfully Finishing Your Bathroom Remodel Adventure

The duration of a bathroom remodel varies based on several factors, including the project’s scope, DIY versus professional involvement, and unforeseen challenges. Opting for a do-it-yourself approach may save money but can extend the timeline, especially for more complex renovations. 

Hiring professionals dedicated to your project or working on multiple jobs often ensures a smoother and more efficient process, with timelines generally ranging from a few days for minor changes to a few weeks for extensive renovations. Careful planning, consideration of builder types, and collaboration with skilled contractors contribute to a successful and timely bathroom remodel. Remember, each phase—from pre-construction to post-construction—plays a crucial role in achieving a well-executed and satisfying result.